
230 V Lighting Design Guide
56
Doc. 4859C | crestron.com
Equipment List Specification
The equipment list is based on the requirements collected for the lighting system in the load schedule. This is a
sequential step-by-step process. The information gathered in previous steps is required to complete following
steps. Once all the steps are completed, a complete Bill of Materials (BOM) for the system is created:
• Module selection is based on the number and type of loads.
• Automation Enclosure selection is based on the number of modules and the available space in the
enclosure.
• User interface selection is based on the user control requirements.
• Wiring plan is based on the previous steps and the layout of the environment.
• Control processor is based on the size of the system (large systems should have a dedicated processor).
• Network block selection is based on the layout and distribution of the loads and user interfaces.
• Accessories selection is based on the required accessories (telephone and alarm systems, HVAC control,
intercom systems, occupancy sensors, etc.).
NOTE: Crestron D3 Pro software is the ideal tool for specifying an equipment list. A fully documented help file
supports the easy-to-use screens and views. It offers the designer a starting place for determining modules and
enclosures. The Crestron D3 Pro software can also generate a load schedule report. Refer to the Crestron website
for detailed information about D3 Pro.
Kommentare zu diesen Handbüchern