Crestron BB-1600 Bedienungsanleitung Seite 8

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 16
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 7
Back Box Crestron BB-1600
4 Back Box: BB-1600 Installation Guide - DOC. 5835A
Securing Metal Electrical Box to Stud
SCREW
HOLES
0.50 in
(1.27 cm)
CUT AWAY
METAL
ELECTRICAL
BOX
STUD
4. Use two #6 screws, not supplied, to secure metal electrical box to
the stud.
5. Pull Cresnet wire through open knockout(s) in metal electrical
box.
NOTE: Wait for gypsum board to be hung before continuing with
remainder of construction method installation.
6. Fasten template, supplied, to mounting surface; cut out and
remove the traced shape.
7. Drill four 5/16” holes as marked on template. Only drill through
gypsum board. Use caution and do not drill through metal bracket
that rests behind gypsum board. Refer to "Cutout Detail of
Supplied Template" on page 10 for an illustrative reference.
8. Drill eight holes marked “A” on template with #20 bit. Only drill
through gypsum board. Use caution and do not drill through
metal bracket that rests behind gypsum board. Refer to "Cutout
Seitenansicht 7
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Kommentare zu diesen Handbüchern

Keine Kommentare